DRAINAGE - Nyrang St Lidcombe for Auburn City Council completed May 2010
Collective Civil Supplied and installed 600 dia RCP drainage. Kerb and gutter needed to be demolished and the asphalt removed.  Collective Civil has rubber pad track machines to make sure we do not damage other surrounding sealed surfaces.

 
 

Different size machines are owned and available to carry out the work without disruption to traffic flow.

 

Collective Civil locate all services by hand after Specialist locators are employed.  Twin pipes are laid over the sewer and under the water main adjacent to gas mains.  Telstra cables aren’t too far away either.  All completed without damage or disturbance to supply.

 

After the pipes are laid then new kerb and gutter is installed and turf and asphalt restores the site to better than the original.  The street will not flood now.  Another quality job is brought in under the budget.

 

Working on site.