Tallowa Dam Fish Lift Collective Civil constructed all the massive gabion walls and spillway structure, erosion control rock mattress, concrete dish drains and major rock work surrounding the concrete structures and new fish lift.
Natural and imported rock was placed by Collective Civil
The massive gabion spillway ready for the flood
The massive gabion spillway ready for the flood
Gabions and concrete dish drains with fish lift structure that carries a small bucket lift full of water and fish over the dam wall and return twice every day.